Tuz Odası Yapımı

Salt Room Construction

Salt Room Construction Involves Several Stages:

  • Site selection
  • Design selection
  • Project design
  • Preparation work

Salt room construction should take into account ventilation and air conditioning systems during the site selection and design phases.

The preparation of the room is carried out based on the patient's needs and according to the instructions and recommendations of expert staff. The construction stages consist of salt coating, equipment installation, and staff training.

Salt coating for walls, salt coating for the ceiling and floor; comfortable chairs, a music system, a screen for playing videos (optional), a lighting system, and decorative elements (stalactites and stalagmites) are used.

Back to blog

Leave a comment

Please note, comments need to be approved before they are published.